U3 ICC Tank Tightness Testing Questions & Answers (A+ Graded 100% Verified)
Question :On a steel tank without cathodic protection, if a
coating is flawed, what happens at the flaw?
- Cathodic surface is increased
- Current flow is increased from this area
- Current flow is increased to this area
Correct answer:b. Current flow is increased from this area
Question :On an impressed current cathodic protection
system, the negative wire of the rectifier is connected to the:
- Anode
- Cathode
- Drop tube
- Dielectric union
Correct answer:b. Cathode
Question :All are examples of acceptable release detection for
tanks, except:
- Impressed current cathodic protection
- Automatic tank gauging
- Statistical inventory reconciliation
- Soil-vapor monitoring
Correct answer:a. Impressed current cathodic protection
Question :When a tank is temporarily closed, the cathodic
protection system:
- Must be turned off
- Must remain in operation
- Should be removed
- Operator can have it on or off.
Correct answer:b. Must remain in operation
Question :When a steel tank is installed with a galvanic CP
system attached, the tank gauges are usually connected through a riser with a dielectric bushing. What is the purpose of that?
- To prevent static discharge
- To minimize effects of noise
- To electrically isolate the tank from the tank gauge
- To prevent water intrusion in the tank
Correct answer:c. To electrically isolate the tank from the
tank gauge
Question :Factory-installed diectric coatings may include all
of the following except:
a . Asphalt
- epoxies
- Enamels
- fiberglass-reinforced plastic
Correct answer:a . Asphalt
Question :According to the EPA, Tank tightness test data
must be maintained for:
- 18 months
- 3 years
- 5 years
- Until the next test is performed
Correct answer:d. Until the next test is performed
Question :How long must records of UST system repairs be
available on site?
- 60 days
- 1 year
- 5 years
- for the remaining lifetime of the UST system
Correct answer:d. for the remaining lifetime of the UST
system
Question :In the event of a release, what is the reporting
requirement?
- ICC licensed supervisor must report the leak within 24
- Owner/Operator must report the leak within 24 hours
- Owner/Operator must report the leak within 18 hours
hours