U3 ICC Tank Tightness Testing Questions & Answers (A+ Graded 100% Verified)

Question :On a steel tank without cathodic protection, if a

coating is flawed, what happens at the flaw?

  • Cathodic surface is increased
  • Current flow is increased from this area
  • Current flow is increased to this area

Correct answer:b. Current flow is increased from this area

Question :On an impressed current cathodic protection

system, the negative wire of the rectifier is connected to the:

  • Anode
  • Cathode
  • Drop tube
  • Dielectric union

Correct answer:b. Cathode

Question :All are examples of acceptable release detection for

tanks, except:

  • Impressed current cathodic protection
  • Automatic tank gauging
  • Statistical inventory reconciliation
  • Soil-vapor monitoring

Correct answer:a. Impressed current cathodic protection

Question :When a tank is temporarily closed, the cathodic

protection system:

  • Must be turned off
  • Must remain in operation
  • Should be removed
  • Operator can have it on or off.

Correct answer:b. Must remain in operation

Question :When a steel tank is installed with a galvanic CP

system attached, the tank gauges are usually connected through a riser with a dielectric bushing. What is the purpose of that?

  • To prevent static discharge
  • To minimize effects of noise
  • To electrically isolate the tank from the tank gauge
  • To prevent water intrusion in the tank

Correct answer:c. To electrically isolate the tank from the

tank gauge

Question :Factory-installed diectric coatings may include all

of the following except:

a . Asphalt

  • epoxies
  • Enamels
  • fiberglass-reinforced plastic

Correct answer:a . Asphalt

Question :According to the EPA, Tank tightness test data

must be maintained for:

  • 18 months
  • 3 years
  • 5 years
  • Until the next test is performed

Correct answer:d. Until the next test is performed

Question :How long must records of UST system repairs be

available on site?

  • 60 days
  • 1 year
  • 5 years
  • for the remaining lifetime of the UST system

Correct answer:d. for the remaining lifetime of the UST

system

Question :In the event of a release, what is the reporting

requirement?

  • ICC licensed supervisor must report the leak within 24
  • hours

  • Owner/Operator must report the leak within 24 hours
  • Owner/Operator must report the leak within 18 hours

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 2, 2025
Description:

U3 ICC Tank Tightness Testing Questions & Answers (A+ Graded 100% Verified) Question :On a steel tank without cathodic protection, if a coating is flawed, what happens at the flaw? a. Cathodic surf...

Get this document $30.00