SWPPP Walmart - Stormwater Exam Questions and Answers Verified by Expert | latest Update
Question : The 1970's law that set into place the regulation of
stormwater is:
Correct answer: The Clean Water Act
Question : Which of the following is never an allowable
stormwater discharge from a construction site?
Correct answer: Discharge from contaminated groundwater
Question : Relative to stormwater permitting, all of the
following must occur before construction starts except:
Correct answer: Submit the notice of termination (NOT)
Question : Of the following factors that influence erosion
rates, the one a contractor has the most control over is:
Correct answer: Groundcover
Question : Common types of erosion include all of the
following except
Correct answer: Sedimentation
Question : Which of the following is NOT a beneficial use of
water?
Correct answer: Flushing a spill down a storm drain
Question : The good housekeeping section of the SWPPP
must include all BUT which of the following
Correct answer: Post construction stormwater management
procedures
Question : Runoff Controls include all but which one of the
following
Correct answer: Rolled Erosion Control Products
Question : Proper spill management should include all of the
following EXCEPT:
Correct answer: Installation of a spill pit on your construction
sites
Question : While inspecting field BMPs, the SWPPP
inspector should perform all of the following EXCEPT:
Correct answer: Assume BMPs are in good condition from a
distance
Question : If your site is inspected by US EPA, or another
regulatory agency, you should:
Correct answer: Be Courteous, Attend their inspection, Allow
access to site and documentation -- All of the above
Question : Potential pollutant sources stored on a construction
site may include
Correct answer: Petroleum storage tanks, soil amendments,
masonry materials -- all of the above
Question : A SWPPP Site Map will show all of the following
except
Correct answer: Notices of Violation
Question : Which of the following information is to be posted
at the entrance to the site?
Correct answer: Construction Site Notice, Permit
authorization, Location of the SWPPP -- All of the above
Question : Requirements for managing stormwater activity on
a construction site are outlined in the following regulation:
Correct answer: NPDES
Question : The Notice of termination can filed when:
Correct answer: All construction activity, inside and outside
the building, is complete and permanent stabilization verified
Question : Which erosion control best mgmt practice
increases water infiltration, dissipates rainfall energy and slows overland flow of stormwater