SWPPP study guide Exam With Correct Questions And Answers | Verified Solutions
Question: Clean Water Act
CORRECT ANSWER : Law set into place in 1970 for storm
water regulation
Question: NPDES
CORRECT ANSWER : Regulations for monitoring storm
water activity on a construction site, are outlined in
Question: When should you read and understand SWPP
CORRECT ANSWER : Immediately after project is awarded
and before you begin any site work
Question: What is not an allowable storm water discharge or
non-storm water discharge
CORRECT ANSWER : Contaminated ground water
Question: When may construction activity begin
CORRECT ANSWER : When jurisdiction of operations
specifies you can start
Question: Waters that fail anti-degradation list are placed on
which list
CORRECT ANSWER : 303D list
Question: SWPPPs certification are signed by who
CORRECT ANSWER : An officer and project owner
Question: The document that must be completed signed and
submitted to the state to obtain authorization to discharge is the NOT. (T/F)
CORRECT ANSWER : FALSE
Question: NOT can be filed when
CORRECT ANSWER : All construction has been completed
both inside and outside
Question: Operations on a construction site are the entity in
charge of plans and specification and the entity who?
CORRECT ANSWER : is in charge of daily activities
Question: Motives for staying in compliance with storm water
objectives?
CORRECT ANSWER : Stay out of trouble with the law
Question: Objectives of the clean water act are
CORRECT ANSWER : To protect and preserve beneficial
use of U.S. waters, maintaining their clean, physical and biological integrity
Question: NPDES stands for
CORRECT ANSWER : National Pollutant Discharge
Elimination System
Question: Which are a component of a good SWPPP
CORRECT ANSWER : Site description and maps,
inspection and maintenance procedure. Potential pollutant
sources, schedules of activities, site contact information, plan certification documents, site contact info and descriptions of controls BMP
Question: Construction sediment is not considered a potential
pollutant source (T/F)
CORRECT ANSWER : False
Question: When modifying or substituting a storm water
BMP the contractor must consult with
CORRECT ANSWER : Project owner, SWPPP designer
Question: NOI must be submitted to the appropriate agency
before the storm water pollution preventive plan is developed (T/F)
CORRECT ANSWER : False
Question: Name> Name of the list with impaired waters is
called totally daily maximum load (T/F)