QSP EXAM 2023-2024 LATEST EXAM 150 QUESTIONS AND

CORRECT DETAILED ANSWERS (VERIFIED ANSWERS )

|ALREADY GRADED A

Stockpiles require a linear sediment barrier at all times, and must be covered prior to a rain event or when inactive. A stockpile is inactive after __days of inactivity.

  • 3
  • 7
  • 10
  • 14 - ANSWER- D

Once identified, dischargers shall begin implementing repairs or design changes to

BMPs:

  • Immediately
  • Within24 hours
  • Within48 hours
  • ASAP, but not more than 72 hours - ANSWER- D

The discharger shall ensure a QSP develop a Rain Event Action Plan (REAP) __ hours prior to any likely precipitation event.

  • Immediately
  • 24 hours
  • 48 hours
  • ASAP but not more than 72 hours - ANSWER- C

A likely precipitation event is any weather pattern that is forecasted to have a __% or greater probability of producing precipitation in the project area.

  • 10
  • 25
  • 50
  • 75
  • 99 - ANSWER- C

TRUE OR FALSE: At Risk Level 2 & 3 sites, receiving water monitoring is

required if the receiving water monitoring trigger exceeded pH, turbidity and SSC.Bioassessment for sites 30 acres or larger. - ANSWER- False (Risk level 3 only)

  • / 2

Visual monitoring is required for non-storm water, pre-rain and post-rain at what Risk Levels?

  • Risk Level 1
  • Risk Level 2
  • Risk Level 3
  • All of the above
  • Risk Level 1 & 2 - ANSWER- D

A storm that produces ½ inch or more of precipitation, with a 48 hour or greater period between rain events is a/an...

  • Qualifying rain event
  • Extended storm event
  • Inactive storm event
  • Unsafe monitoring event - ANSWER- A

Upload photos to SMARTS that are taken during daily inspections of the LUP site before, during, and after every ___ storm event

  • First
  • Second
  • Third
  • Fourth - ANSWER- C

Which statement is false? Monitoring is not required when:

  • the site/sampling locations are unsafe to access due to the storm event
  • it is outside of scheduled site operation hours
  • the contractor elects not to work and the site is "shut down" for a rainy day -

ANSWER- C

What is the Numeric Action Level (NAL) for pH?

  • 3.5-5.5
  • 6.0-9.0
  • 6.5-8.5
  • 9.0-12.0 - ANSWER- C

What is the exceedance trigger for Receiving Water Monitoring?

  • 100 NTU
  • 250 NTU
  • 500 NTU
  • 1,000 NTU - ANSWER- C
  • / 2

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration