PMT 0170 RISK MANAGEMENT

EXAM QUESTIONS & ANS WERS

Question: Which of the following is a step of the

Department of Defense (DoD) Risk Management Process?

CORRECT ANSWER : Mitigation

Question: Which of the following is a critical success

factor to ensure effective risk management (RM)?

CORRECT ANSWER : Assembling the most qualified

personnel for the team

Question: The following describes which type of category

of risk: Certification for a new weapons system is

scheduled for January. To conduct a meaningful test, temperatures must be below freezing. If the temperature is too warm, the test cannot be conducted.

CORRECT ANSWER : Technical

  • | Page

Question: Which of the following are the components of

opportunity management (OM)?

CORRECT ANSWER : Future root cause, probability,

benefit

Question: Within a program, which of the following

entities is responsible for ensuring the risk management (RM) process is executed according to the Program Risk Process (PRP) Document?

CORRECT ANSWER : Risk Management Board (RMB)

Question: During the Materiel Solution Analysis (MSA)

phase, it is important to assess risks to achieve exit criteria for which review?

CORRECT ANSWER : System Requirements Review

(SRR)

Question: Monte Carlo simulations use computational

algorithms to simulate the behavior of various systems in a nondeterministic manner. Why are these

  • | Page

"nondeterministic" results important to program schedule analysis?

CORRECT ANSWER : Because there are one or more

points in the simulation where a choice is made between different paths, without any specific guidance on which one will be chosen

Question: We have an expert-written solution to this

problem!Your program includes teams in six different locations.These teams need access to different pieces of risk monitoring data in order to monitor, manage, and report risk. Which of the following risk monitoring tools would be most appropriate?

CORRECT ANSWER : Risk Management (RM)

information systems

Question: Based on the results of a simulation, there is a

70% chance that the project will end two weeks behind schedule. Using the table provided, what would the cumulative schedule risk be, based on a two-week schedule delay?

  • | Page

CORRECT ANSWER : Probability 2; Schedule Impact 2

Question: Which of the following are typical sources of

framing assumptions (FAs)? (Select three that apply.)

CORRECT ANSWER : Technological and engineering

challenges, Interdependencies with other programs, Cost, schedule, and requirements tradeoffs

Question: Which of the following are Management Level

responsibilities during the risk management (RM) process? (Select two that apply.)

CORRECT ANSWER : Approve risk closure for IPT-

level risks and notify the program RMB for closure, Reviews risks affecting and owned by multiple IPTs

Question: You are managing the implementation of an

aircraft for the Marines that was originally designed for and implemented by the Navy. What type of analysis would help you identify potential risks to your program?

CORRECT ANSWER : Lessons learned

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 18, 2025
Description:

PMT 0170 RISK MANAGEMENT EXAM QUESTIONS & ANS WERS Question: Which of the following is a step of the Department of Defense (DoD) Risk Management Process? CORRECT ANSWER : Mitigation Question: Which...

Get this document $30.00