phase 1 Latest Update 2025-2026 Questions and

Study Guides Aug 27, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

ALC Demolitions Combat Engineer 12B30 ALC phase 1 Latest Update 2025-2026 Questions and 100% Verified Correct Answers Guaranteed A+

Formula for Abatis - CORRECT ANSWERS: P = D2/50

Formula for External Timber Cutting - CORRECT ANSWERS: P = D2/40

Formula for Internal Timber Cutting - CORRECT ANSWERS: P = D2/250

How does charge construction affect the outcome of the blast? - CORRECT

ANSWERS: - Placement and priming. Where the prime is placed will dictate the

direction of the explosive wave.

M112 Block Unit and RE - CORRECT ANSWERS: - 1.25 Unit

- 1.34 RE

M118 Block Unit and RE - CORRECT ANSWERS: -

Problem Solving Format: Step 1 - CORRECT ANSWERS: Identify and measure critical dimensions.

Problem Solving Format: Step 2 - CORRECT ANSWERS: Calculate for TNT/Rule of thumb

Problem Solving Format: Step 3 - CORRECT ANSWERS: - Divide by RE Factor (Skip this step if using TNT)

  • / 1

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 27, 2025
Description:

ALC Demolitions Combat Engineer 12B30 ALC phase 1 Latest Update 2025-2026 Questions and 100% Verified Correct Answers Guaranteed A+ Formula for Abatis - CORRECT ANSWERS: P = D2/50 Formula for Exter...

Get this document $30.00