OSP EXAM PRACTICE TEST Exam Questions and Answers Designers who deal with OSP construction will be involved in acquisition of right-of-way.Even if not directly involved in the actual right-of-way acquisition, OSP designers need to be aware of the responsibilities that other parties have in
obtaining right-of-way, including all except:
• Acquisition processes.• Types of right-of-way required.• Easement required.• Legal ramifications involving clients. - Correct Answers ✅Easement required Is the legal right to pass through or over property owned by another party.• Easement • Right of way • Leasehold • Life estate - Correct Answers ✅Right of way Right-of-way is the legal right to pass through or over property owned by another party. This includes the land on which facilities are built. These facilities
can take the form of all except : 1 / 2
OSP EXAM PRACTICE TEST Exam Questions and Answers • Transmission lines.• High-pressure gas lines.• Railroads.• Bridge.• Telecommunications facilities. - Correct Answers ✅Bridge Some of the disadvantages of using a star topology campus
backbone cabling are that it:
• Provides centralized facilities administration.• Allows testing and reconfiguration of the system's topology and applications from the
MC (CD).
• Introduces single points of failure.• Allows easy maintenance and security against unauthorized access. - Correct Answers ✅• Introduces single points of failure.which cable may be buried directly only in areas where there is a low risk of damage from rodent or other environmental hazards?• PASP cable