NERC PREP TEST 101 EXAM QUESTIONS

AND ANSWERS 100% SOLVED (Newest 2025)

  • If a 500 kV transmission line with a surge impedance
  • loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur?

  • Generator MVAR output would increase
  • All system capacitors would trip off-line
  • Generator MVAR output would decrease
  • All automatic reactors would connect to the system -
  • Correct Answers ✅a. Generator MVAR output would increase

  • When system conditions are such that emergency
  • procedures are expected to be implemented, which of the following actions should be considered first?

  • Shed firm load
  • Implement Active Load Management
  • Return outaged equipment to service
  • Request a voltage reduction - Correct Answers ✅c.
  • Return outaged equipment to service

  • If your transmission path is rated for 1200 MW and 1000
  • MW are scheduled on it, but due to parallel flows the actual flow is 1300 MW, what action should you take? 1 / 4

NERC PREP TEST 101 EXAM QUESTIONS

AND ANSWERS 100% SOLVED (Newest 2025)

  • Request that a phase shifting transformer be installed
  • Reduce interchange transactions impacting the path
  • Request all parallel flow to PSEs to increase schedules
  • Reduce all commercial customer load - Correct Answers
  • ✅b. Reduce interchange transactions impacting the path

  • If your system is MVAR deficient, what action could be
  • implemented to prevent voltage collapse?

  • Raise system frequency above 60.5 Hz
  • Shed firm load in the deficient area
  • Separate from the Interconnection
  • Lower transmission voltages - Correct Answers ✅b.
  • Shed firm load in the deficient area

  • Which of the following actions can a system operator take
  • in order to maintain stability on the system?

  • Request generators to absorb maximum MVAR
  • Place all operating limits on dynamic calculation
  • Raise system voltages as high as possible, but within their
  • operating parameters 2 / 4

NERC PREP TEST 101 EXAM QUESTIONS

AND ANSWERS 100% SOLVED (Newest 2025)

  • Reduce voltages on the transmission system - Correct
  • Answers ✅c. Raise system voltages as high as possible, but within their operating parameters

  • Which of the following actions should you take if an outage
  • on a neighboring system has caused a violation on your system?

  • Open all tie-lines to your neighbor
  • Ask the Reliability Coordinator for assistance
  • Shed load to mitigate the violation
  • Wait for the neighboring system to contact you - Correct
  • Answers ✅b. Ask the Reliability Coordinator for assistance

  • If a SOL or IROL violation occurs due to transfers across the
  • system and it is determined that parallel flows are contributing to the violation, what should the system operator do?

  • Place all system capacitors in service
  • Reduce system load
  • Inform the Reliability Coordinator
  • Dump firm load - Correct Answers ✅c. Inform the
  • Reliability Coordinator 3 / 4

NERC PREP TEST 101 EXAM QUESTIONS

AND ANSWERS 100% SOLVED (Newest 2025)

  • While performing a pre-outage study, you identify that the
  • transmission outage will cause a thermal violation on a parallel path, which of the following actions would be the first one you would implement?

  • Shed load to mitigate the concern
  • Allow the outage to occur and see what happens
  • Reschedule the outage if possible
  • Allow the outage to take place as long as no load is lost -
  • Correct Answers ✅c. Reschedule the outage if possible

  • Which of the following actions should the system operator
  • implement first if transmission line limits exceed the facilities emergency limits based on a contingency that has not yet occurred, but their protocols are to respond on a pre- contingency basis?

  • Reduce voltages in the area of the violation
  • Remove the facility from service
  • Curtail any interchange transactions that are curtailable
  • Only implement actions if the contingency occurs -
  • Correct Answers ✅c. Curtail any interchange transactions that are curtailable

  • / 4

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Business
Added: Aug 1, 2025
Description:

NERC PREP TEST 101 EXAM QUESTIONS AND ANSWERS 100% SOLVED (Newest 2025) 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the follow...