ANSWERS 100% SOLVED (Newest 2025) Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant?

  • Nuclear generators
  • Combustion turbine generators
  • Geothermal generators
  • Hydroelectric generators - Correct Answers ✅C.
  • Geothermal generators If a reliability coordinator identifies that there is a potential transmission related problem in the area, who should they notify?

  • Marketers in the area
  • Other reliability coordinators in the interconnection
  • All purchasing selling entities
  • Generation operators in the area of the potential problem -
  • Correct Answers ✅B. Other reliability coordinators in the interconnection Restoration services on critical telecommunications channels should be available _____.

  • 24 hours per day
  • Within 12 hours of a telecommunication channel failure
  • By the end of the next business day 1 / 4

NERC PRACTICE EXAM QUESTIONS AND

ANSWERS 100% SOLVED (Newest 2025)

  • Within 72 hours of the contingency occurring - Correct
  • Answers ✅A. 24 hours per day According to NERC, A balancing authority may elect to fulfill its contingency reserve obligations by participating as a member of a _____

A. ISO

  • Reserve sharing group

C. RTO

  • Regional reliability organization - Correct Answers ✅B.
  • Reserve sharing group If you were to experience the northern lights what would be your concern with the operation of the power system?

  • System harmonics causing oscillations
  • A reduction of MVAR consumption
  • Generator output reduction
  • Transformer overheating - Correct Answers ✅D.
  • Transformer overheating Your BA has a net scheduled interchange of 650 MW and your actual interchange is 800 MW. The frequency bias setting for your BA is 65 MW/0.1 Hz. There is a disturbance on the system and the actual frequency is 60.02 Hz. What is your

ACE? 2 / 4

NERC PRACTICE EXAM QUESTIONS AND

ANSWERS 100% SOLVED (Newest 2025)

A. -163 MW

B. -137 MW

C. 137 MW

  • 163 MW - Correct Answers ✅D. 163 MW
  • Generators have the ability to be used as voltage control devices. If a generator raises its VAR output the system operator should expect the system voltage to

  • Decrease
  • Increase
  • Not change
  • Collapse - Correct Answers ✅B. Increase
  • if a BA has 500 MW of spinning reserves and of that 300 are regulating reserves, by definition, NERC requires the regulating reserves must be ____?

  • Online and AGC responsive
  • Able to ramp to full load within 10 minutes
  • Able to be online within 10 minutes
  • Able to be online within 5 minutes - Correct Answers
  • ✅A. Online and AGC responsive There is a shunt capacitor on your system that has a rating of 50 MVAR @ 138 KV. The voltage at the time of switching the 3 / 4

NERC PRACTICE EXAM QUESTIONS AND

ANSWERS 100% SOLVED (Newest 2025) capacitor in service is 124 KV. What would be the expected output of the capacitor?

A. 45 MVAR

B. 43.5 MVAR

C. 50 MVAR

  • 40.5 MVAR - Correct Answers ✅D. 40.5 MVAR
  • Which mode of AGC operation is the one that NERC states will be used unless such operation is adverse to the system or interconnection Reliability?

  • Constant interchange
  • Tie-line Bias
  • Constant frequency
  • Load-frequency bias - Correct Answers ✅B. Tie-line Bias
  • You have a 600 MW unit that is currently loaded at 300 MW and frequency drops .2 Hz. What will the new output of the generator be as a result of the drop in frequency due to droop characteristic?

A. 300 MW

B. 340 MW

C. 260 MW

  • 380 MW - Correct Answers ✅B. 340 MW
  • / 4

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 1, 2025
Description:

NERC PRACTICE EXAM QUESTIONS AND ANSWERS 100% SOLVED (Newest 2025) Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. ...

Get this document $30.00