NERC PRACTICE EXAM QUESTIONS AND
ANSWERS 100% SOLVED (Newest 2025) Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant?
- Nuclear generators
- Combustion turbine generators
- Geothermal generators
- Hydroelectric generators - Correct Answers ✅C.
- Marketers in the area
- Other reliability coordinators in the interconnection
- All purchasing selling entities
- Generation operators in the area of the potential problem -
- 24 hours per day
- Within 12 hours of a telecommunication channel failure
- By the end of the next business day 1 / 4
Geothermal generators If a reliability coordinator identifies that there is a potential transmission related problem in the area, who should they notify?
Correct Answers ✅B. Other reliability coordinators in the interconnection Restoration services on critical telecommunications channels should be available _____.
NERC PRACTICE EXAM QUESTIONS AND
ANSWERS 100% SOLVED (Newest 2025)
- Within 72 hours of the contingency occurring - Correct
Answers ✅A. 24 hours per day According to NERC, A balancing authority may elect to fulfill its contingency reserve obligations by participating as a member of a _____
A. ISO
- Reserve sharing group
C. RTO
- Regional reliability organization - Correct Answers ✅B.
- System harmonics causing oscillations
- A reduction of MVAR consumption
- Generator output reduction
- Transformer overheating - Correct Answers ✅D.
Reserve sharing group If you were to experience the northern lights what would be your concern with the operation of the power system?
Transformer overheating Your BA has a net scheduled interchange of 650 MW and your actual interchange is 800 MW. The frequency bias setting for your BA is 65 MW/0.1 Hz. There is a disturbance on the system and the actual frequency is 60.02 Hz. What is your
ACE? 2 / 4
NERC PRACTICE EXAM QUESTIONS AND
ANSWERS 100% SOLVED (Newest 2025)
A. -163 MW
B. -137 MW
C. 137 MW
- 163 MW - Correct Answers ✅D. 163 MW
- Decrease
- Increase
- Not change
- Collapse - Correct Answers ✅B. Increase
- Online and AGC responsive
- Able to ramp to full load within 10 minutes
- Able to be online within 10 minutes
- Able to be online within 5 minutes - Correct Answers
Generators have the ability to be used as voltage control devices. If a generator raises its VAR output the system operator should expect the system voltage to
if a BA has 500 MW of spinning reserves and of that 300 are regulating reserves, by definition, NERC requires the regulating reserves must be ____?
✅A. Online and AGC responsive There is a shunt capacitor on your system that has a rating of 50 MVAR @ 138 KV. The voltage at the time of switching the 3 / 4
NERC PRACTICE EXAM QUESTIONS AND
ANSWERS 100% SOLVED (Newest 2025) capacitor in service is 124 KV. What would be the expected output of the capacitor?
A. 45 MVAR
B. 43.5 MVAR
C. 50 MVAR
- 40.5 MVAR - Correct Answers ✅D. 40.5 MVAR
- Constant interchange
- Tie-line Bias
- Constant frequency
- Load-frequency bias - Correct Answers ✅B. Tie-line Bias
Which mode of AGC operation is the one that NERC states will be used unless such operation is adverse to the system or interconnection Reliability?
You have a 600 MW unit that is currently loaded at 300 MW and frequency drops .2 Hz. What will the new output of the generator be as a result of the drop in frequency due to droop characteristic?
A. 300 MW
B. 340 MW
C. 260 MW
- 380 MW - Correct Answers ✅B. 340 MW