NERC Exam Study Questions Emergency Preparedness Questions With Complete Solutions
Q1: For the annual test of an entity's back-up functionality
Operating Plan to be valid, it must demonstrate which of the following?
- Back-up functionality is maintained for at least 2
- All shift personnel are comfortable at the backup site
- Transition time is one hour or less
- The backup site is secure - Correct Answers ✅A) Back-
continuous hours
up functionality is maintained for at least 2 continuous hours
Q2: A BA is experiencing low voltage in the northeast region.
A 50 MVA generator in that area is loaded at 50 MWs. What action could a System Operator take to increase the voltage in that area?
- Increase generation to overload capacity
- Decrease reactive power until voltage increases
- Do nothing; the AVR will take care of it
- Decrease real power and increase reactive power -
Correct Answers ✅D) Decrease real power and increase reactive power
Q3: Maintenance in the area has resulted in the ICCP
communication line being cut to the control room. Which of the following actions is most appropriate?
- Implement the plan for Loss of Control Center Functionality 1 / 2
NERC Exam Study Questions Emergency Preparedness Questions With Complete Solutions
- Manually update State Estimator with the most current
- Report the loss of ICCP to NERC
- Switch AGC to Flat Frequency Control - Correct Answers
information
✅C) Report the loss of ICCP to NERC
Q4: A portion of a Reliability Coordinator Area is experiencing
low voltage. What Operating Instructions should the RC issue?
- Lower transfers across area and decrease generation
- Increase transfers across area and decrease generation
- Lower transfers across area and increase generation
- Increase transfers across area and increase generation -
Correct Answers ✅C) Lower transfers across area and increase generation
Q5: Interconnection frequency is at 59.85 Hz. The System
Operator has not experienced any disturbances. What does this indicate?
- Interconnection voltage and load are not balanced
- Interconnection system loads are higher than on-line
- Collective system generation is higher than system load
- A loss of load - Correct Answers ✅B) Interconnection
- / 2
generation
system loads are higher than on-line generation