NCCCO Mobile Crane Exam Questions and 100

Study Guides Aug 2, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

  • | P a g e

NCCCO Mobile Crane Exam Questions and 100% Correct Verified ANSWERs| Grade A **1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up?**

  • Boom down
  • Swing
  • Boom up
  • Extend boom

ANSWER: c. Boom up

This is the standard hand signal for "boom up" per ASME B30.5 and OSHA guidelines.

---

**2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid?**

  • 1%
  • 2%
  • 5%
  • 8%

ANSWER: a. 1%

  • | P a g e

OSHA 1926.1431 requires cranes to be level within 1% when hoisting personnel to ensure load chart ratings remain valid.

---

**3. The load line of the crane you're operating contacts an energized power line. There's no sign of any other danger, such as fire. What should you do?**

  • Climb down carefully from the crane cab
  • Jump down, feet together
  • Stay in the cab until the lines are de-energized
  • Get as far away from the crane as possible

ANSWER: c. Stay in the cab until the lines are de-energized

OSHA 1926.1408 advises staying in the cab to avoid electrocution unless there’s an immediate danger (e.g., fire).

---

**4. According to OSHA 1926.1413, how many randomly distributed broken wires in rotation-resistant rope are cause for replacement of the rope?**

  • 1 broken wire in 6 rope diameters
  • 2 broken wires in 30 rope diameters
  • | P a g e
  • 3 broken wires in one strand in one lay
  • 2 broken wires in 6 rope diameters

ANSWER: d. 2 broken wires in 6 rope diameters

OSHA 1926.1413(a)(2)(ii)(A)(1) specifies that rotation-resistant rope must be replaced if there are 2 randomly distributed broken wires in 6 rope diameters or 4 in 30 rope diameters. The question asks for the minimum threshold, which is 2 in 6.

---

**5. What is the net capacity of a crane on main boom unless the manufacturer states otherwise?**

  • The capacity listed in the load chart minus the weight of the
  • rigging and all attachments

  • The capacity listed in the load chart plus the weight of the
  • rigging and all attachments

  • The capacity listed in the load chart minus the weight of the
  • rigging and all attachments not in use

  • The capacity listed in the load chart minus the weight of the
  • rigging alone

ANSWER: a. The capacity listed in the load chart minus the

weight of the rigging and all attachments Net capacity accounts for deductions of all rigging and attachments per ASME B30.5.

  • | P a g e

---

**6. What may happen to a properly rigged load when lifted off the ground unless the operator takes account of boom deflection?**

  • It could swing out away from the crane
  • It could swing in towards the crane
  • It could raise absolutely vertically
  • It could shift in its rigging

ANSWER: a. It could swing out away from the crane

Boom deflection increases the radius, causing the load to swing outward if not compensated.

---

**7. What Standard Method hand signal is being illustrated?**

  • Swing
  • Stop
  • Emergency Stop
  • Travel

ANSWER: a. Swing

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 2, 2025
Description:

NCCCO Mobile Crane Exam Questions and 100% Correct Verified ANSWERs| Grade A **1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a f...

Get this document $30.00