MISY 5340 Exam 2 Jim: Questions & Accurate Solutions
Which one of the following are key organizational data relevant to the production process?
- Company Code
- Credit Control Area
- Client
- Storage Location
- Plant Right Ans - A
- Work Centers
- Material Masters
- Bill of Materials
- Client
- Company Code Right Ans - A
- On
- Off
- Active
- Inactive
- Open Right Ans - C
- Setup Time
- Alternate time
- Build Time
- Teardown time
- Processing time Right Ans - A
C D E The master data relevant to the production process are
B C Which of the following are statuses that can apply to a BOM?
D What are the basic time elements in the production process?
D
E 1 / 2
Which of the following can be included in processing time?
- Machine time
- Configuring work center
- Configuring equipment
- Labor Time
- Setup Time Right Ans - A
- Floating
- Volatile
- Fixed
- Explosive
- Variable Right Ans - C
- Processes that use the material
- Material Type
- Organizational level
- Material Composition
- Material description Right Ans - A
- Raw materials
- Fixtures
- Engineering drawings
- Calibration instruments
- Warehouse building Right Ans - B
- How many units of a product are needed
- Where the finished goods are to be shipped
- / 2
D Which of the following are the general classifications of time elements in production?
E The material master is grouped into different views or segments based on which factors?
B C Examples of production resource tools are?
C D A planned order is a formal request that indicates?