2024 NSCA CSCS Practical Applied Latest Questions With Complete Grade A Answers
- What are policies, procedures, and mission statements
Answer:
- facility's rules and regulations
- how policies are met
- foundation to admin, provide focus, direction, and sense of purpose
- What should be the overall goal of an S&C Program
Answer: Focus on injury prevention and increased athletic performance
- Who has full use of the facility
Answer: S&C Director and Assistant, facility operator has normal hours.
- Who is allowed to tour facilities
Answer:
Guests of AD and sport coach, Recruits and special guests.Large group and general public not allowed
- Who is eligible to use S&C facility
Answer: Athletes in sponsored sport, new incomers or transfers registered, student in phys ed class, All coaches, admin, sports med. Alumni and individuals approved by AD and S&C director
- What are the preparticipation requirements
Answer: Screening and clearance is re- quired first
- What happens when an athlete breaks the facility rules and repeated offenses
Answer:
- 1st - verbal warning, remind what happens with 2nd offense
- 2nd - dismissal from facility for one day, documentation, correspondence with
- 3rd - dismissal from facility for one week
- 4th - dismissal from facility for remainder of year
- 5th - permanent dismissal
athlete's coach, remind 3rd offense
- Who do you notify when there is an accident or injury
Answer: The S&C director, sports med dept, and campus security (if applicable)
- / 3
- What is product liability
Answer: legal responsibilities of those who manufacture or sell products if a person sustains injury or damage as a result of using a product
- What are the 4 phases of a new facility design
Answer:
- Predesign
- Design
- Construction phase
- Preoperative phase
- Length of Predesign phase and what needs to happen.
Answer:
- 25% total time (6 months)
- Design of facility, 1. Needs Analysis, 2. Feasibility study (SWOT), 3. Master plan
- Length of Design phase and what needs to happen
Answer:
- 10% total time (3 months)
- Finalize blueprints
- Length of Construction phase and what needs to happen
Answer:
- 50% total time (12 months)
- deadline set and adhered to
- be present on site to make sure things are being adhered to
- Length of preoperation phase and what needs to be done
Answer: (Start-UP) - 15% total time (3-4 months)
- staff should have education, employment experience and certification
- What is the recommended ceiling height for a facility
Answer: 12-14 ft clearance
- What is the best type of flooring for a facility
Answer: carpet and resilient, rubberized surface, Wood with rubber on sides for
olympic platforms
- What is minimum height for windows and mirrors in a facility
Answer: 20 inches above the floor 2 / 3
- What is the ideal temperature range, humidity, and air circulation in a facility
Answer:
72-78 degrees 60% or less 8-12 air exchanges per hour
- Where should tall equipment and dumbbell racks be placed in a facility
Answer: - Along the wall to help with visibility
- What is the minimum distance between bars, equipment and weight trees in a
facility
Answer: 36 inches
- How much square feet is needed for aerobic equipment
Answer:
24 sq/ft bikes and stair machines
- sq/ft skiing machines 40 sq/ft rowers
45 sq/ft treadmills
- What is needed on nonfunctional or broken equipment
Answer: "Out of Order" Signs
23. What are the proper staff:athlete ratios
Answer:
Middle school - 1:10 Secondary School - 1:15
Older than Secondary - 1:20
Should never exceed 1:50
- What is negligence and the 4 parts
Answer: Failure to act as a reasonable person Needs: Duty, Breach of Duty, Proximate Cause, and Damages
- What is scope of practice
Answer: proper legal parameters and professional duties
- What is needed in an Emergency Care Plan
Answer: EMS procedures, Names and #'s of contacts, address to facility, locations of telephones, exits and supplies, sports med staff
- What is #1 priority of S&C facility
Answer: SAFETY