ISYE6644 MIDTERM 2 NEWEST 2025 ACTUAL

Study Guides Aug 2, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

  • | P a g e

ISYE6644 MIDTERM 2 NEWEST 2025 ACTUAL

EXAM COMPLETE ALL 130 QUESTIONS AND

CORRECT DETAILED ANSWERS (VERIFIED

ANSWERS) |ALREADY GRADED A+ (BRAND

NEW VERSION!!)

  • True or False? You can pre-assign a service time as an
  • attribute before you actually get to the server that you'll be using.

ANSWER: T

  • True or False? If you have a Create module generating one-at-
  • a-time customer arrivals, then it is not possible to use a different Create module with 4-at-a-time customer arrivals.

ANSWER: F

Explanation: Multiple Create modules can be used with

different arrival patterns in Arena

  • True or False? Fake customers can be used to schedule
  • machine breakdowns, keep track of which time period the simulation is currently in, and carry out other duties not associated with actual customers.

  • | P a g e

ANSWER: T

  • Which module/spreadsheet is NOT in the Advanced Process
  • panel?

ANSWER: Process Module

Explanation: The Process Module is in the Basic Process

panel, not Advanced Process

  • Why are things like Seize, Delay, Release in multiple
  • templates?

ANSWER: The Process module does not allow us to use

Seize, Delay, Release with sufficient generality

Explanation: Advanced Process and Blocks templates provide

more flexibility

  • True or False? You can schedule failures to occur after a
  • random number of customers have used a resource or after a random amount of time has passed.

ANSWER: T

  • | P a g e
  • True or False? You are only allowed to schedule one type of
  • failure for a particular resource.

ANSWER: F

Explanation: Multiple failure types can be scheduled in Arena

  • Which block is NOT in the Blocks template?

ANSWER: Process block

Explanation: There is no "Process block"; the Process module

is in the Basic Process panel

  • True or False? The Queue block can connect up to the Seize
  • module from the Advanced Process template.

ANSWER: F

Explanation: Queue block typically connects differently in the

Blocks template

  • Which kinds of sets are allowed?

ANSWER: Resources set, counter set, entity type set, entity

picture set

  • | P a g e
  • True or False? It is possible for the resource Joey to be a
  • member of three different resource sets.

ANSWER: T

  • True or False? For easy display and organizational purposes,
  • our Call Center simulation is divided into several submodels.

ANSWER: T

  • True or False? The customer arrival pattern for our Call
  • Center changes over the day and is therefore modeled as a nonhomogeneous Poisson process.

ANSWER: T

  • True or False? All of the Tech Support servers for our Call
  • Center are equally skilled and have the same concurrent work schedules.

ANSWER: F

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 2, 2025
Description:

ISYE6644 MIDTERM 2 NEWEST 2025 ACTUAL EXAM COMPLETE ALL 130 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+ (BRAND NEW VERSION!!) 1. True or False? You can pre-assign a...

Get this document $30.00