- | P a g e
ICC Vapor Recovery 2 Actual Exam 2025/2026 Complete Questions And Correct Detailed Answers (Verified Answers) |Already Graded A+||Brand New Version!!
Which of the following is not an overfill prevention device?
- ball float
- spill bucket
- tank overfill alarm
- drop tube flapper valve - ANSWER-b. spill bucket
According to PEI RP300, a combustible gas indicator can be used to:
- determine carbon dioxide levels
- monitor benzene, toluene, and ethyl benzene levels
- determine the upper explosive limit of gasoline
- detect vapor leaks in vapor recovery system - ANSWER-d. detect
vapor leaks in vapor recovery system
The 3 elements collectively referred to as the "Fire Triangle" are:
- oxygen, fuel, and LEL 1 / 3
- | P a g e
- fuel, fire, and carbon dioxide
- fuel, oxygen, and ignition source
- ignition source, carbon dioxide, and fuel - ANSWER-c. fuel, oxygen,
and ignition source
In a coaxial hose for a balance system, the product flows through:
- the bellows
- the inner hose
- ignition outer hose
- both hoses - ANSWER-b. the inner hose
Which of the following would not be considered a hanging hardware component?
- nozzle
- swivel
- whip hose
- shear valve - ANSWER-d. shear valve
To test the dispenser piping on the suction side of a Healy Phase II EVR system, a ____ inch water column gauge is required.
- / 3
- | P a g e
- 0-2
- 0-5
- 0-10
- 0-100 - ANSWER-d. 0-100
When installing the Phil-Tite Phase I EVR system the installer should
reference all of the following materials EXCEPT:
- The applicable Executive Order.
- The list of definitions found in VR-101-E.
- The Phil-Tite Phase I EVR Equipment Installation List.
- The applicable installation, operation and maintenance manual. -
ANSWER-b. The list of definitions found in VR-101-E
According to CP-201, condensate traps shall meet the following
requirements EXCEPT:
- CARB-certified
- capable of automatic evacuation of liquid.
- installed at least below the UST tank level
- equipped with an alarm system in case of failure of the evacuation
- / 3
sytem - ANSWER-c. installed at least below the UST tank level