PART 1

In the PEI #300 manual, pressure decay, dynamic back pressure, and A/L testing satisfy who's testing requirements?

A. CARB

  • water resources
  • environmental health
  • fire department - ANSWER-A. CARB

When removing liquid from a sump or spill bucket and the liquid contains fuel, it must ____?

  • be managed as hazardous waste
  • pumped into a bucket to evaporate
  • scooped or bailed onto the concrete pad to evaporate
  • put into a sealed container, then put into the trash container -
  • ANSWER-A. be managed as hazardous waste

  • / 4
  • | P a g e

Before working on any electrical circuits always de-energize and use

A. NFPA

B. OSHA

C. ICC

D. UBC - ANSWER-A. NFPA

The two point Phase I vapor recovery system requires that a separate vapor recovery riser pipe be installed in the tank and be equipped with a ____?

  • drop-tube
  • locking block valve
  • P/V vent
  • vapor recovery adaptor - ANSWER-D. vapor recovery adaptor

The term "hanging hardware" refers to...

  • nozzle, hose breakaway
  • vent cap, nozzle, swivel
  • shear valve, UDC, hose
  • sump sensor, vapor valve, nozzle - ANSWER-A. nozzle, hose
  • breakaway 2 / 4

  • | P a g e

A valve installed in a motor-vehicle fueling hose designed to separate with little or no product spillage when excessive pulling force is placed on the hose is called ____?

  • breakaway
  • hose clamp
  • shear valve
  • flow limiter - ANSWER-A. breakaway

In the PEI #500 manual, a Level II Qualified Person can do all

EXCEPT:

  • open cabinet doors
  • reconnect breakaways
  • measure nozzle flow rates
  • repair or replace dispenser components - ANSWER-d. repair or
  • replace dispenser components

A Gilbarco Vapor-Vac, OPW Vapor Saver system is considered to have a vapor recovery equipment defect (VERD) if the vapor escape guard on an OPW 12-VW nozzle is missing or damaged on at least ____% of the circumference of the device?

  • / 4
  • | P a g e
  • 25
  • 50
  • 75
  • 100 - ANSWER-c. 75

A Phase I System consists of all except ____

  • coaxial system
  • balance system
  • manifold system
  • vacuum assist system - ANSWER-d. vacuum assist system

CARB's most recent vapor recovery regulation are known as:

  • EVR
  • CVR
  • PVR
  • ORVR - ANSWER-a. EVR

The main purpose of a combustible gas indicator is to detect ____

  • vapor leaks
  • / 4

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 23, 2025
Description:

ICC Vapor Recovery 1 PART1 &2 Actual Exam Complete 200 Questions And Correct Detailed Answers (Verified Answers) |Already Graded A+||Brand New Version!! PART 1 In the PEI #300 manual, pressure deca...

Get this document $30.00