ICC GENERAL REQUIREMENTS VERSION 1

which of the following would typically not be needed by the special inspector? - CORRECT ANSWER -d.) design calculations

which of the following would typically be required for work performed on the premises of an approved fabricator - CORRECT ANSWER -a.)no inspection

when discrepancies go uncorrected and a correction notice is issued, who must be notified? - CORRECT ANSWER -b.)city inspector and registered design professional

rebar placement for wall panels in a two story tilt up, in seismic design category D, requires what type of special inspection? - CORRECT ANSWER -a.) periodic 1 / 4

  • | P a g e

continuous special inspection is required for all of the following except... - CORRECT ANSWER -c.)post-installed mechanical anchors installed to anchor the bottoms of storage racks to a 3000 psi concrete slab

Structural observation - CORRECT ANSWER -b.) shall be provided for structures in seismic design category D,E, or F

whenever strength tests are cast, what other tests should be performed? - CORRECT ANSWER -b.) temperature, slump, and air content

who shall prepare the statement of special inspection? - CORRECT ANSWER -c.) Registered design professional

an evaluation report... - CORRECT ANSWER -b.) presents the findings of a technical evaluation of a building product, certifying the products compliance with the code requirements

who can issue a stop work order? - CORRECT ANSWER -c.) Building official

  • / 4
  • | P a g e

work that usually requires special inspection in the field but is instead performed off-site on the premises of a fabricator during fabrication... - CORRECT ANSWER -c.) does not require special inspection if the fabricator is registered and approved

all of the following should be on a daily report except... - CORRECT ANSWER -a.) ASTM standard for any testing performed

the final report shall be submitted... - CORRECT ANSWER -c.) at a point in time agreed upon by the owner and building official

discrepancies or non-conforming items shall be brought to the immediate attention of the - CORRECT ANSWER -a.) contractor

who has the authority to enforce the special inspection provisions on a job? - CORRECT ANSWER -a.) contractor

the type and extent of each special inspection and each test shall be located in... - CORRECT ANSWER -d.) The statement of special inspections

  • / 4
  • | P a g e

who is responsible for providing the special inspector access to approved plans? - CORRECT ANSWER -a.) Contractor

who is responsible for submitting revised plans to the building official for approval - CORRECT ANSWER -b.) Registered design professional

if discrepancies are not corrected, who shall be notified - CORRECT ANSWER -b.) Registered design professional and building official

who should a special inspector check in with upon arriving at the job site - CORRECT ANSWER -c.) Contractor

who is responsible for coordinating on-site inspections? - CORRECT ANSWER -b.) Contractor

Who performs structural observations? - CORRECT ANSWER - d.) Registered design professional

the special inspector should perform all of the following while on the job site except... - CORRECT ANSWER -d.) Provide all documentation to check in with the local jurisdiction

  • / 4

Download Document

Buy This Document

$3.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Construction and Industry
Added: Aug 5, 2025
Description:

ICC GENERAL REQUIREMENTS EXAM ( 2 LATEST VERSIONS) NEWEST EXAM 2025 ACTUAL EXAM COMPLETE ALL 200 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+|BRAND NEW!! ICC GENERAL...

Get this document $3.00