Is NESHAP notification required for the mechanical removal of more than 160 square feet of asbestos-containing mastic? - ANSWER-Yes. Removal of otherwise nonfriable ACM by mechanical means will render it friable. Therefore, it is RACM and the AQMD must be notified prior to removal.
What is the federal OSHA regulation that regulates asbestos exposure for construction? - ANSWER-29 CFR 1926.1101
What types of work are included in OSHA's 29 CFR 1926.1101
- ANSWER-demolition, salvage, removal, encapsulation of
ACM, construction, alteration of ACM or construction, alteration, repair, maintenance, renovation, or clean up of debris.
What does PEL stand for? What is the PEL for asbestos? What is an EL? What is the EL for asbestos? - ANSWER-Permissible Exposure Limit. 1 / 4
- | P a g e
0.1 f/cc for an 8 hour time weighted average (TWA).Excursion Limit 1.0 f/cc over 30 minutes at peak exposure time.
What does f/cc mean? - ANSWER-Fibers per cubic centimeter
What does PACM stand for? What materials are PACM ? - ANSWER-Presumed Asbestos Containing Materials.PACM means thermal system insulation and surfacing material found in buildings constructed no later than 1980.
What are the four classes of work defined by Cal OSHA 29 CFR 1926.1101 - ANSWER-Class 1 , Class 2 , Class 3, and Class 4
Define Class 1 from 29 CFR 1926.1101 - ANSWER-means activities involving the removal of TSI and surfacing ACM and PACM. (in amounts greater than 1 glove bag)
Define Class 2 from 29 CFR 1926.1101 - ANSWER-means activities involving the removal of ACM which is not TSI or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and 2 / 4
- | P a g e
sheeting, roofing and siding shingles, and construction mastics.(in amounts greater than 1 glove bag)
Define Class 3 from 29 CFR 1926.1101 - ANSWER-means repair and maintenance operations, where "ACM", including TSI and surfacing material is likely to be disturbed. (in amounts no greater than 1 standard sized [60" x 60"] glove bag)
Define Class 4 from 29 CFR 1926.1101 - ANSWER-means maintenance and custodial activities during which employees contact ACM and PACM and activities to clean up waste and debris containing ACM and PACM.
What engineering controls are always required regardless of the class of work? - ANSWER-1. Vacuum cleaners equipped with HEPA filters (except for some roof jobs)
- Wet methods (except where not feasible)
- Prompt clean up
In addition to the engineering controls required regardless of the class of work, what control methods are required to achieve compliance with the PEL and EL? - ANSWER-1. Local exhaust ventilation with HEPA filter 3 / 4
- | P a g e
- Enclosure or isolation of removal processes
- Ventilation of the regulated area to move contaminated air
- Use of other work practices and engineering controls that the
- If control methods are insufficient to reduce employee
away from the breathing zone of employees and toward a filtration device equipped with a HEPA filter
Assistant Secretary (OSHA) can show to be feasible
exposure to or below the PEL and/or EL the employer shall use them to reduce the levels as low as possible and supplement with greater respiratory protection.
What work practice and engineering controls for the removal of ACM or PACM are prohibited? - ANSWER-1. High speed abrasive saws without a point of cut ventilator or enclosures with HEPA filtered exhaust air.
- Compressed air used to remove asbestos unless used in
- Dry sweeping, shoveling, or other dry clean up of
- Employee rotation as a means of reducing employee exposure
- / 4
conjunction with an enclosed ventilation system designed to capture ACM dust.
ACM/PACM dust/debris.
to asbestos.