CADE Storm Water Compliance Construction Exam With Correct Questions And Answers

Question : The Clean Water Act

CORRECT ANSWER : The 1970's law that set into place

the regulation of storm water

Question : NPDES

CORRECT ANSWER : Requirements for managing storm

water activity on a construction site are outlined in the following regulation

Question : Discharge From Contaminated Ground Water

CORRECT ANSWER : Never an allowable discharge from a

construction site

Question : A notice of termination can be filed when?

CORRECT ANSWER : All construction activity, inside and

outside of the building is complete. Permanent stabilization has been verified.

Question : The storm water notice of intent must be

submitted?

CORRECT ANSWER : After the SWPPP is prepared and

before starting construction.

Question : Potential pollutant sources stored on a construction

site may include?

CORRECT ANSWER : Petroleum storage tanks, fertilizer,

lime, and masonry materials.

Question : The SWPPP implementation sequence may be

modified?

CORRECT ANSWER : After consulting with the project

SWPPP designer (CEC) and if required, the project owner and receiving written approval.

Question : A SWPPP site map will show all of the following?

CORRECT ANSWER : Location of BMP's, Phasing &

Sequence, Limits of Disturbance

Question : Which of the following information is to be posted

at the entrance to the site?

CORRECT ANSWER : Construction site notice, permit

authorization, location of SWPPP

Question : Which of the following is not a beneficial use

water?

CORRECT ANSWER : Flushing water down a storm drain

Question : When installing and maintaining a check dam

make sure...?

CORRECT ANSWER : The low point (overflow) of the

check dam is in the middle of the channel

Question : To reduce the possibility of undercutting in

channels, you should?

CORRECT ANSWER : Install filter fabric under rock &

similar materials placed within the storm water conveyance.

Question : The good housekeeping section of the SWPPP

must include?

CORRECT ANSWER : Hazardous waster management,

solid waste, sanitary waste and disposal procedures.

Question : Runoff controls include?

CORRECT ANSWER : Diversions, check dams, slope

drains

Question : Which erosion control best management practice

increases water infiltration, dissipates rainfall energy, and slows overland flow of storm water?

CORRECT ANSWER : Vegetation

Question : The contractor has the most control over what

erosion rate factor?

CORRECT ANSWER : Groundcover

Question : The primary purpose of a construction exit?

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 18, 2025
Description:

CADE Storm Water Compliance Construction Exam With Correct Questions And Answers Question : The Clean Water Act CORRECT ANSWER : The 1970's law that set into place the regulation of storm water Que...

Get this document $30.00