NCCOl Dedicatedl Pilel Driverl Operatorl Certificationl Examl (Latestl 2025/l 2026l Update)l Questionsl &l Answers|l Gradel A|l 100%l Correctl (Verifiedl Solutions)
Q:l Accordingl tol ansil a10.19howl frequentl shouldl al diesell hammerl greasel fittingl bel lubed
Answer:
Everyl shift
Q:l Accordingl tol ansil a10.19l howl shalll shackelsl bel securedl againstl unintendedl opening
Answer:
Steell wirel orl equivalent
Q:l Accordingl tol ansil a10.19,l shopl madel liftingl devies
Answer:
Mustl bel designatedl byl al registeredl professionall engineer
Q:l Accordingl tol oshal 1926.1417(c)(2)l ifl thel electricl ratedl capacityl limiterl goesl outl inl cabl duringl operationsl thel operatorl must
- / 3
Answer:
Ceasel operationsl untill ratedl capacitiesl arel available.
Q:l Accordingl tol oshal 1926.1400l whol mustl developl proceduresl forl
assembly/disassemblyl ifl notl usingl manufacturersl specificatoins
Answer:
Qualifiedl person
Q:l Accordingl tol oshal 1926.1400l tablel al whenl operatingl nearl powerl linesl ratedl atl 260kvl thel minimuml clearancel distancel is
Answer:
25
Q:l Whol tellsl thel operatorl whenl thel pilel hasl reachedl itsl requiredl depth
Answer:
Qualifiedl person
Q:l Whatl couldl causel damagel tol al hammer
Answer:
Exceedingl hammerl limits
Q:l Whatl isl practicall refual
- / 3
Answer:
Conditionl reachedl whenl al pilel bringl drivenl byl al hammerl hasl al penetrationl perl blowl thatl isl smallerl thanl al specifiedl value
Q:l Whatl isl al dedicatedl pilel driverl netl capacity
Answer:
Manufacturersl loadl ratingl minusl deductions
Q:l Whatl isl thel correctl temporaryl procedurel whenl anl operationall aidl inl thel cabl shutsl down
Answer:
Safelyl stopl operationsl untill thel temporaryl alternativel measuresl arel implemented
Q:l Oshal 1926.1400l definitionl ofl al competentl person
Answer:
Capablel ofl identifyingl hazardsl andl hasl authorityl tol takel promptl correctivel measuresl tol eliminatel them
Q:l Al pilel pointl is
Answer:
Al speciall typel ofl pilel shoe
- / 3