CDS - Exam 1 Questions and Verified

Study Guides Aug 1, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

CDS - Exam 1 Questions and Verified Answers, 100% Score Guarantee Pass (Latest 2025) Labor and material payment bonds provide the necessary protection on public projects - Correct Answers ✅TRUE Miller act corresponds with what.? - Correct Answers ✅Labor and material payment bond Architects should not advise owners and the legal sufficiency of required affidavits, waivers, or releases of liens. - Correct Answers ✅TRUE Liens are not permitted on public projects. - Correct Answers ✅TRUE Architect must review, approve, and promptly submit shop drawings required by the contract documents. - Correct Answers ✅TRUE An architect approved shop drawings which deviated from the contract documents. - Correct Answers ✅Changes in contract drawings must be submitted in writing to architect before becoming affective, not equal to revisions within shop drawings.Who is responsible for errors and omissions in shop drawings?

  • Correct Answers ✅General Contractor 1 / 3

CDS - Exam 1 Questions and Verified Answers, 100% Score Guarantee Pass (Latest 2025) Revisions not requested by the architect on resubmitted shop drawings don't require architect's approval? - Correct Answers ✅FALSE A contractors stamp of approval on shop drawings means that the contractor has already determined all criteria related thereto. - Correct Answers ✅FALSE AIA document B101 is used to outline the architects service obligations? - Correct Answers ✅TRUE The architects responsibilities are re-stated within the AIA General Conditions Doc A201. - Correct Answers ✅TRUE Contractors may not know what services the architect is obligated to perform if what document is not part of the contract documents. - Correct Answers ✅AIA Document B101 In review of shop drawings the general conditions Document A201 clearly states? - Correct Answers ✅Matters outside the scope of the design concept and the contract documents are not reviewed. 2 / 3

CDS - Exam 1 Questions and Verified Answers, 100% Score Guarantee Pass (Latest 2025) If an architect had performed their services using stipulations of AIA documents A201 & B141 within a ______ there should be no concern about professional liability. But general liability is different. - Correct Answers ✅Standard of care Calendar days - Correct Answers ✅7 / Week Liquidated damages is a provision included in the? - Correct Answers ✅Owner-contractor agreement. Document A101.An amount of money stipulated in the contract that is chargeable against the contractor is reimbursement for damages suffered by the owner because the contractors failure to fulfill his or her contractual obligation's. - Correct Answers ✅Liquidated damages What clause should be used when a slight delay in schedule can cause a breach of contract? - Correct Answers ✅Time is of the essence CPM is superior to a Bar Chart because it shows durations, sequences and relationships to other activities. - Correct Answers ✅TRUE

  • / 3

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 1, 2025
Description:

CDS - Exam 1 Questions and Verified Answers, 100% Score Guarantee Pass (Latest 2025) Labor and material payment bonds provide the necessary protection on public projects - Correct Answers ✅TRUE M...

Get this document $30.00