BECC MOD 1 TEST QUESTIONS AND VERIFIED

Study Guides Aug 17, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

BECC MOD 1 TEST QUESTIONS AND VERIFIED

CORRECT ANSWERS LATEST VERSION 2023

SCORE 100%

-Section 1 of the Tag-out log contains the Tag-Out User's Manual and other amplifying instructions for administering the tag out process. This section also contains the list of Authorizing Officers. -Section 2 the Danger/Caution Tag-Out Index and Record of Audits - Commonly referred to as the Tag-out Index sheet, the form provides a ready reference of existing tag-outs, while ensuring the sequential issuing of tag-out serial numbers for all tag-outs issued. It is also used by the Authorizing Officer to record the results of tag-out program audits. -Section 3 active Tag-Out Record Sheets (TORS) - The TORS are used to list all the tags associated with the tag-out of a specific system or component. It is also used to record discrepancies (including corrective actions) found during the audit of the particular tag-out action. Section 4 Instrument Log - It has a sequential listing of all the labels for Out-of-Commission and Out-of-Calibration instruments. Section 5 Cleared TORS and index pages - They are required to remain in this section until the next tag-out audit is completed - Correct Answer

(True/False) If computed stay times in a space are less than the scheduled duration of watch and/or work periods, the periods must be adjusted. - Correct AnswerTRUE

(True/False) Keep the victim lying down with their head elevated until the type and seriousness of the injury is determined. - Correct AnswerFALSE

(True/False) PQS provides an effective way to monitor an individual's qualification progress. - Correct AnswerTRUE

(True/False) Section 300 of the PQS book list infrequent task and abnormal conditions.

  • Correct AnswerTRUE

(True/False) The second person signing the tags may accompany the person attaching the tags? - Correct AnswerFALSE

  • Which portion of the PMS Master File provides the work center supervisor a ready
  • reference of planned maintenance requirements.? - Correct AnswerWORK CENTER

PMS MANUAL

A chest injury victim that has breathing difficulties should be placed on/in - Correct AnswerSITTING OR SEMI-SITTING POSITION

A Dial indicator may be used to....... - Correct AnswerALIGN MACHINERY

A five inch outside micrometer will measure objects that are ....... inches thick. - Correct Answer4-5IN

  • / 2

A term used to describe total breakdown of the body's heat balance is ...... - Correct AnswerHEAT STROKE

A torque wrench is used to measure the tightness of ... - Correct AnswerFASTENERS

All "Cleared" Danger/Caution tag-out Record Sheets are filed in section five until ....... - Correct AnswerTHE NEXT TAG OUT AUDIT

An example of a noise hazard requiring only single hearing protection would be a .......at ....... dB. - Correct AnswerPAINT CHIPPER AT 100DB'S

An out of calibration pressure gauge must be recorded in section ...... of the Tag-Out log. - Correct AnswerFOUR

At what level of continuous noise, is single hearing protection required? - Correct Answer84 DB

Electrical power tools must be inspected prior to issue by a qualified ....... - Correct AnswerELECTRICIAN

If a maintenance procedure does not specify a torque sequence, utilize the recommended sequence found in ....... - Correct AnswerNTM CHAPER 075

If a planned maintenance action cannot be completed in accordance with the steps listed on the MRC, the maintenance man should ....... - Correct AnswerSTOP AND

REPORT TO THE WCS

If two or more symptoms of stack gases are exhibited, then the stay times are divided by ...... - Correct Answer3

In the Hearing Conservation Program, physical exclusion is referred to as - Correct AnswerAUDITORY REST

It is NOT safe to operate electrical power tools in areas where ....... is/are present. - Correct AnswerFLAMMABLE GASES

Maintenance aboard ship is the responsibility of the ....... - Correct AnswerSHIPS FORCE

Material needed to perform a specific PMS action is listed on the ...... - Correct AnswerMRC (MAINTENANCE REQUIREMENT CARD)

Materials needed to perform the required maintenance are found on the - Correct AnswerFRONT OF THE MRC

  • / 2

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 17, 2025
Description:

BECC MOD 1 TEST QUESTIONS AND VERIFIED CORRECT ANSWERS LATEST VERSION 2023 SCORE 100% -Section 1 of the Tag-out log contains the Tag-Out User's Manual and other amplifying instructions for administ...

Get this document $30.00