Asbestos Practice Exam 4 Questions with Correct Answers 100% Verified 2024 What are common symptoms of mesothelioma? - Correct Answer Persistent stomach pain, persistent shortness of breath, persistent chest pain Which of the of the following is a common symptom of lung cancer? - Correct Answer Persistent cough or change in cough pattern Which of the following is necessary insurance coverage necessary for asbestos contractors? - Correct Answer 500,000 per occurrence for bodily injusry and property damage combined Start up sequence is as follows - Correct Answer - post warning signs
- pre-cleaned and removed removable objects
- precleaned and sealed fixed objects
- interruped and tagged electrical circuits
- precleaned surfaces
- sealed off room penetrations
- erected containment barriers
- shut down the HVAC system
- at least two workers inside tunnel with supplied air respirators
- standby workers posted with rescue equipment, including self contained breathing apparatus
-energize negative air filtration units
When a worker is removing asbestos from a steam tunnel a small opening, what is requried? - Correct Answer -constant communication between workers
--> Not required- a bell connected toa long cord which can be activated by workers What should be done with the asbestos records if an asbestos contractor goes out of business after 25 years and there is no one remaining in the business to store the records? - Correct Answer He must notify the director of the NIOSH at least 3 months prior to the planned disposing of the records On or after Jan 1, 1987, contractos must be certified to handle ACM of how many square feet? - Correct Answer 100 or more 1 / 2
What is the most common symptom of asbestosis? - Correct Answer Shortness of breath or rales If removing more than ____ lf of asbestos pipe insulation or ____ sf of asbestos surfacing material the EPA regional office and or the State must be contacted and given advance notice - Correct Answer 260, 160 According to GISO 5208, a medical examination must be given how soon after an employee begins asbestos work? - Correct Answer Within 30 days of the beginning of work When must DOSH be notified if a condemned building is about to collapse is torn down and 150 sf of ACM is to be removed? - Correct Answer With as much advanced notice as possible.Which of the following is necessary when workers are to work in high temperature work areas? - Correct Answer The should be trained in emergency procedures for termperature related illnesses and injuries.When is it the safest to handle asbestos? - Correct Answer when it is wet What is requried during asbestos training? - Correct Answer - notice of the specific nature of the operations
- notice of the increased risk of cancer w cigarettes
- notices in spanish for spanish speaking workers
- / 2
--- NO - Notice of the history of asbestos use Workers have been standing in a contaminated area. If the lab tests took 9 days to complete and the results showed 5 fiters/cc and the contractor told the workers as soon as he found out the results, he proceeded - Correct Answer incorrectly. he must notify them within 5 days of exposure.How many years must medical and monitoring records concerning asbestos exposure at a workplace be kept? - Correct Answer 30 What areas are included in the post abatement cleanup? - Correct Answer - areas needing recleaning after visual inspection