f-53 Emergency one-way voice announcement personnel | 117 Questions and Answers with complete Solutions | Updated
Question : Assembly Area
Correct answer: A designated area outside of a building to
which building occupants are directed to report upon implementation of partial or full evacuation in accordance with comprehensive fire safety and emergency action plan or a fire and emergency preparedness plan
Question : automatic
Correct answer: As applied to fire protection devices, any
device, equipment or system that initiates system function as a result of a predetermined temperature rise, rate of temperature rise, or combustion products, without the necessity for human intervention
Question : Certificate of operation
Correct answer: A written statement issued by the fire
Commissioner approving the operation of a central station, for
which such certificate is required by this code or the rules, or the constructions codes
Question : covered mall
Correct answer: A group of M building housing separate
mercantile tenant spaces and/or other similar occupancies and a common and a common pedestrian area. A covered mall does not include an exterior perimeter or tenant space with direct pedestrian access to the covered mall.
Question : Place of Assembly Safety Personnel
Correct answer: A person holding a certificate of fitness for
place of assembly safety personnel
Question : FSP Staff
Correct answer: The individual identified in a fire safety and
evacuation plan as responsible for the implementation of such plan
Question : High Rise Building
Correct answer: Any building designed or constructed in
accordance with the 1968 Building Code, any prior Building Code, or other applicable laws, rules and regulations, that is more than six stories or 75 feet/
Question : Mixed -Occupancy
Correct answer: A building or structure housing more than
one occupancy or type required by this chapter to prepare an emergency plan
Question : Non-fire Emergency
Correct answer: A biological, chemical, radio-logical or
nuclear incident or release; declaration of emergency plan by a lawful authority; explosion; medical emergency; natural disaster; or other emergency affecting the premises or the safety of building occupants
Question : owner
Correct answer: The fee owner or lessee of the building, or
other person or entity having charge thereof.
Question : A pre-signal system
Correct answer: A fire alarm systems having a feature that
allows initial fire alarm signal to sound in a constantly attended central location and for which a human action is subsequently required to achieve a general alarm, or a feature that allows the control equipment to delay the general alarm by more than one minute ( but not more than 3 minutes) after the start of the alarm processing
Question : Shelter in place
Correct answer: The precaution of directing building
occupants to remain indoor, at their present location, in response to a fire or non-fire emergency.
Question : Sprinkler System
Correct answer: A fire system, other than a mist fire
extinguishers system, that utilizes water as the extinguishing agent