Air assault Phase 2 test FY2024-2025 Questions

Study Guides Aug 15, 2025
Loading...

Loading document viewer...

Page 0 of 0

Document Text

Air assault Phase 2 test FY2024-2025 Questions and 100% Verified Correct Answers Guaranteed A+

All ground personnel must wear what? - CORRECT ANSWER: Helmet

Ear pro Eye pro Sleeves rolled down ID Card and tags Gloves

For the M149 water trailer what is it's empty weight, ACL, max weight, front link count, rear, and breakaways? - CORRECT ANSWER: Ew: 2,540lbs

ACL: 400gals

Max: 6,060lbs

Link count front: 3

Rear: 3

Breakaways: 2

For the M1097 HMV what is the empty weight, ACL, Max weight, front link count, rear link count and breakaways? - CORRECT ANSWER: Ew: 5,600lbs

ACL: 4,400lbs

Max:10,000lbs

Link count front: 60

Rear: 10

  • cluster breakaway

For the quadcon what is it's empty weight, ACL, max weight, front link count/rear, breakaways? - CORRECT ANSWER: Ew: 1,764lbs

ACL: 5,236lbs

Max: 7,000lbs

Link count front: 3 for two quads

Link count rear: 3 for two quads

  • break away for two quads
  • *refer to book for characteristics of two quads*

If unit commanders are responsible for training their personnel, what appendix might they look at for help inside of TM 4-48.09? - CORRECT ANSWER: Appendix J for Jobs

Is the CH-47 center hook release lever accessible by ground crew? - CORRECT

ANSWER: No, must manually depress the spring loaded keeper and remove apex

fitting from cargo hook.

The cargo hook release can opened electronically or manually by who? - CORRECT

ANSWER: The air crew, Pilot, or crew chief 1 / 2

The supported unit is responsible for what? - CORRECT ANSWER: Pick up site

selection and control Distributing completed copies of sling load inspection record Verifying the total weight of the load

To be a sling load inspector, what qualifications must you have? - CORRECT ANSWER: E4 or above and be a graduate of either air assault, pathfinder, or Sling Load Inspector Certification Course

What 3 units are involved in a sling load operation? - CORRECT ANSWER: Supported unit Aviation unit Receiving unit

What are aviation units responsible for? - CORRECT ANSWER: Coordinating with

supporting and receiving units Advising the supported unit on the helicopter capabilities and limitations Advising the suitability of the selected landing site Assist in the recovery and return of sling load equipment

What are the 3 phases of a sling load operation ? - CORRECT ANSWER: Preparation

and rigging Inspection of preparation and rigging Sling load operation

What are the 6 advantages to a sling load op? - CORRECT ANSWER: -Rapid

movement -Bypass surface obstacles -Rapid relocation -Use of multiple flight routes and landing sites to enhance sustainability and security ground unit -establishment of multiple landing sites to support the maneuvering unit requirements -movement flexibility

What are the 7 limitations of a sling load op? What is the biggest? - CORRECT

ANSWER: -weight of load is restricted to the aircrafts operating capability

-load instability during flight may restrict aircraft airspeed -adverse Weather and darkness

*ATMOSPHERIC CONDITIONS*

  • limited number of helicopters
  • -landing site surface conditions -landing site being increased because of reduced visibility

What are the cargo hook capacities for uh-60 A/LM? - CORRECT ANSWER: A: 8,000

L/M: 9,000

  • / 2

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 15, 2025
Description:

Air assault Phase 2 test FY2024-2025 Questions and 100% Verified Correct Answers Guaranteed A+ All ground personnel must wear what? - CORRECT ANSWER: Helmet Ear pro Eye pro Sleeves rolled down ID C...

Get this document $30.00