Air assault Phase 2 test FY2024-2025 Questions and 100% Verified Correct Answers Guaranteed A+
All ground personnel must wear what? - CORRECT ANSWER: Helmet
Ear pro Eye pro Sleeves rolled down ID Card and tags Gloves
For the M149 water trailer what is it's empty weight, ACL, max weight, front link count, rear, and breakaways? - CORRECT ANSWER: Ew: 2,540lbs
ACL: 400gals
Max: 6,060lbs
Link count front: 3
Rear: 3
Breakaways: 2
For the M1097 HMV what is the empty weight, ACL, Max weight, front link count, rear link count and breakaways? - CORRECT ANSWER: Ew: 5,600lbs
ACL: 4,400lbs
Max:10,000lbs
Link count front: 60
Rear: 10
- cluster breakaway
For the quadcon what is it's empty weight, ACL, max weight, front link count/rear, breakaways? - CORRECT ANSWER: Ew: 1,764lbs
ACL: 5,236lbs
Max: 7,000lbs
Link count front: 3 for two quads
Link count rear: 3 for two quads
- break away for two quads
*refer to book for characteristics of two quads*
If unit commanders are responsible for training their personnel, what appendix might they look at for help inside of TM 4-48.09? - CORRECT ANSWER: Appendix J for Jobs
Is the CH-47 center hook release lever accessible by ground crew? - CORRECT
ANSWER: No, must manually depress the spring loaded keeper and remove apex
fitting from cargo hook.
The cargo hook release can opened electronically or manually by who? - CORRECT
ANSWER: The air crew, Pilot, or crew chief 1 / 2
The supported unit is responsible for what? - CORRECT ANSWER: Pick up site
selection and control Distributing completed copies of sling load inspection record Verifying the total weight of the load
To be a sling load inspector, what qualifications must you have? - CORRECT ANSWER: E4 or above and be a graduate of either air assault, pathfinder, or Sling Load Inspector Certification Course
What 3 units are involved in a sling load operation? - CORRECT ANSWER: Supported unit Aviation unit Receiving unit
What are aviation units responsible for? - CORRECT ANSWER: Coordinating with
supporting and receiving units Advising the supported unit on the helicopter capabilities and limitations Advising the suitability of the selected landing site Assist in the recovery and return of sling load equipment
What are the 3 phases of a sling load operation ? - CORRECT ANSWER: Preparation
and rigging Inspection of preparation and rigging Sling load operation
What are the 6 advantages to a sling load op? - CORRECT ANSWER: -Rapid
movement -Bypass surface obstacles -Rapid relocation -Use of multiple flight routes and landing sites to enhance sustainability and security ground unit -establishment of multiple landing sites to support the maneuvering unit requirements -movement flexibility
What are the 7 limitations of a sling load op? What is the biggest? - CORRECT
ANSWER: -weight of load is restricted to the aircrafts operating capability
-load instability during flight may restrict aircraft airspeed -adverse Weather and darkness
*ATMOSPHERIC CONDITIONS*
- limited number of helicopters
-landing site surface conditions -landing site being increased because of reduced visibility
What are the cargo hook capacities for uh-60 A/LM? - CORRECT ANSWER: A: 8,000
L/M: 9,000
- / 2