ACIl Concretel Field-Testingl Technician-l Gradel Il Examl Guidel (Latestl 2025/l 2026l Update)l Q/Al |l Gradel A|l 100%l Correctl (Verifiedl Answers)

Q:l Whatl shouldl bel donel ifl thel concretel containsl aggregatel largerl thanl isl appropriatel forl thel sizel ofl thel moldsl orl equipmentl beingl used?l (Orall Exam)

Answer:

Wetl sieving

Q:l Startl thel testsl forl slump,l temperature,l andl airl contentl withinl howl manyl minutesl afterl obtainingl thel finall portionl ofl thel compositel sample?l (Orall Exam)

Answer:

5l min.

Q:l Startl moldingl specimensl forl strengthl testsl withinl howl manyl minutesl afterl fabricatingl thel compositel sample?l (Orall Exam)

Answer:

15l min.

Q:l Froml whatl mustl thel concretel samplel bel protected?l (Orall Exam)

Answer:

Sun,l wind,l rapidl evaporation,l andl contamination

Q:l ASTMl C143

  • / 4

Answer:

Standardl Testl Methodl forl Slumpl ofl Hydraulic-Cementl Concrete

Q:l Thel slumpl testl isl applicablel tol plasticl concretel withl al maximuml sizel aggregatel ofl _____l .

Answer:

1½l in.

Q:l Whenl thel concretel containsl aggregatel largerl thanl allowedl forl thel slumpl test,l thel largel aggregatel mustl bel _____.

Answer:

Removedl byl wetl sievingl thel samplel overl 1½l in.l sieve

Q:l Thel moldl forl makingl thel slumpl testl isl inl thel shapel ofl _____.

Answer:

Thel frustuml ofl al cone

Q:l Thel heightl ofl thel slumpl moldl isl _____.

Answer:

12l in.

Q:l Thel interiorl surfacel ofl thel slumpl moldl isl allowedl tol havel minorl irregularities.l Truel orl False?

Answer:

False

  • / 4

Q:l Forl usel inl thel slumpl test,l thel endl orl bothl endsl ofl thel tampingl rodl mustl bel

_____.

Answer:

Roundedl tol al hemisphericall tip

Q:l Thel samplel ofl concretel forl usel inl makingl thel slumpl testl mustl bel obtainedl inl accordancel withl ASTMl Standardl _____.

Answer:

C172,l Standardl Practicel forl Samplingl Freshlyl Mixedl Concrete

Q:l Thel slumpl moldl shouldl bel inl al dryl conditionl beforel beginningl thel test.l Truel orl False?

Answer:

False

Q:l Thel surfacel onl whichl thel slumpl moldl willl bel placedl mustl bel _____.

Answer:

Flat,l level,l moist,l nonabsorbent,l andl freel ofl vibration

Q:l Thel slumpl moldl isl filledl inl _____l layers.

Answer:

3

Q:l Eachl layerl shouldl filll approximatelyl _____l thel volumel ofl thel mold.

Answer:

One-third 3 / 4

Q:l Thel approximatel concretel depthl (inl verticall distance)l afterl placingl thel firstl layerl isl _____,l andl thel secondl layerl isl _____.

Answer:

2⅝l in.l [70l mm],l 6⅛l in.l [160l mm]

Q:l Whatl isl thel specifiedl numberl ofl roddingsl forl eachl layer?

Answer:

25

Q:l Howl deepl shouldl thel tampingl rodl penetratel intol eachl layer?

Answer:

Rodl eachl layerl throughoutl itsl depth;l onl thel secondl andl finall layers,l thel rodl shouldl penetratel intol thel previousl layerl approximatelyl 1l in.l [25l mm]

Q:l Whenl roddingl thel bottoml layer,l thel tampingl rodl mustl bel _____l tol uniformlyl distributel thel strokes.

Answer:

Slightlyl inclined

Q:l Whatl mustl bel donel ifl thel concretel dropsl belowl thel topl ofl thel slumpl moldl whilel thel topl layerl isl beingl rodded?

Answer:

Addl additionall concretel tol keepl anl excessl ofl concretel abovel thel topl ofl thel moldl atl alll times

  • / 4

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 23, 2025
Description:

ACIl Concretel Field-Testingl Technician-l Gradel Il Examl Guidel (Latestl 2025/l 2026l Update)l Q/Al |l Gradel A|l 100%l Correctl (Verifiedl Answers) Q:l Whatl shouldl bel donel ifl thel concretel...

Get this document $30.00