ACI WRITTEN EXAM QUE STIONS

WITH CORRECT ANSWERS

Question : The method of determining air content of concrete

containing lightweight aggregate is the pressure method

Correct answer: False. Relatively dense

Question : Is the following statement true or false? When

making a test cylinder from concrete being used in construction, the field technician must also measure the slump of the concrete.

Correct answer: True

Question : While the technician is checking the slump of the

concrete, there is a decided falling away or shearing off of concrete from one side of the sample. What should the technician do?

Correct answer: Disregard the test and retest on another

portion of the sample.

Question : Preparation of specimens for transport includes:

  • | Page

Correct answer: Determination that at least 8 hours has

elapsed since final set.

Question : If the aggregate correction factor for a given source

of fine and coarse aggregate is found to be 0.2% in a pressure air meter, and an air content value of 5.0% is read on the gauge of the same air meter containing concrete with the same aggregate, what is the correct air content?

Correct answer: 4.8%

Question : Strength test specimens transported from the field

to the testing laboratory must be:

Correct answer: Protected from jarring, moisture loss, and

freezing

Question : Tests for slump and air content must be started

within ________ after obtaining the final portion of the composite sample.

Correct answer: 5 MInutes

  • | Page

Question : The minimum size for samples to be used for

strength test is:

Correct answer: 1 cubic foot

Question : Is the following statement true or false? After

strike off of the measure used to determine density, a small quantity of concrete may be added to correct a deficiency.

Correct answer: False

Question : For normal strength concretes, what temperature

range must be maintained for test cylinders during initial curing?

Correct answer: 60 to 80 degrees f (16 to 27 degrees C)

Question : Is the following statement true or false? When

concrete contains large aggregate, the testing technician should wet-sieved the sample before making density (unit weight) tests for use in yield computations.

Correct answer: False

  • | Page

Question : When determining the temperature of fresh mixed

concrete, what is the minimum amount of concrete cover in all directions around the sensor of the temperature measuring device?

Correct answer: 3 inches ( 75MM)

Question : Is the following statement true or false? The sides

of the slump mold should be lightly tapped to consolidate the concrete in the mold.

Correct answer: false

Question : Is the following statement true or false? Unless

specified otherwise, strength test specimens molded from concrete having a slump less than 25mm (1 inch) must be consolidated by vibration.

Correct answer: True

Question : Is the following statement true or false? Test

cylinders may be capped with a thin layer of portland cement paste which is permitted to harden and cure with the specimen

Correct answer: True

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration