  • For concrete with aggregates less than 3 inches, the
  • thermometer must remain in the fresh concrete sample a minimum of 5 minutes or until the temperature reading stabilizes. (T/F)

ANSWER: F (2 minutes but not more than 5)

  • The temperature measuring device must be accurate to within

0.1°. (T/F)

ANSWER: F (1°F or 0.5°C)

  • The temperature measuring device shall have a capacity of
  • measuring temperature of freshly mixed concrete throughout a

range of ___ to ___ F:

ANSWER: 30° to 120°F

  • | P a g e
  • A composite sample is not needed if only the temperature test
  • is being run. (T/F)

ANSWER: T

  • The temperature of fresh concrete in a placement must be
  • measured by inserting a thermometer into the top six inches of concrete. (T/F)

ANSWER: F (Does not specify aggregate size; ASTM C1064

requires a minimum of 3 in. submersion)

  • ASTM C1064 states the container used to measure the
  • temperature of concrete must be large enough to provide at least

  • inches of concrete. (T/F)

ANSWER: F (3 inches or must be 3x the nominal max size)

  • The temperature of the concrete is recorded to the nearest ___

°F:

ANSWER: 1°F

  • | P a g e
  • Calibrate the temperature measuring device at least ___, or

whenever there is a question of accuracy:

ANSWER: Annually

  • After the thermometer is placed in the concrete, what should
  • be done?

ANSWER: Gently press concrete around the thermometer

  • According to ASTM C1064, what is one reason to take the
  • temperature of concrete?

ANSWER: Verify conformance

  • It is allowable to remove the temperature measuring devices
  • from the freshly mixed concrete to read the temperature if you cannot see the reading. (T/F)

ANSWER: F

  • | P a g e
  • The maximum allowable time between obtaining the first
  • and last portions of the composite sample may not exceed 5 minutes. (T/F)

ANSWER: F (15 minutes)

  • Start molding specimens for strength tests within 30 minutes
  • after fabricating the composite sample. (T/F)

ANSWER: F (15 minutes)

  • The composite concrete sample must be protected from the
  • sun, wind, contamination, and rapid evaporation. (T/F)

ANSWER: T

  • If the concrete contains aggregate larger than those that are
  • appropriate for the size of mold or equipment used, the sample should be wet sieved before making the test. (T/F)

ANSWER: T

Download Document

Buy This Document

$30.00 One-time purchase
Buy Now
  • Full access to this document
  • Download anytime
  • No expiration

Document Information

Category: Study Guides
Added: Aug 14, 2025
Description:

ACI CONCRETE FIELD TESTING CERTIFICATION GRADE I EXAM NEWEST 2025 ACTUAL EXAM COMPLETE 100 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+ --- 1. For concrete with aggr...

Get this document $30.00