{"id":20992,"date":"2025-06-14T21:23:11","date_gmt":"2025-06-14T21:23:11","guid":{"rendered":"https:\/\/gaviki.com\/blog\/?p=20992"},"modified":"2025-06-14T21:23:15","modified_gmt":"2025-06-14T21:23:15","slug":"which-of-the-following-statements-is-true-5","status":"publish","type":"post","link":"https:\/\/gaviki.com\/blog\/which-of-the-following-statements-is-true-5\/","title":{"rendered":"Which of the following statements is true"},"content":{"rendered":"\n<p>Which of the following statements is true? 1. The main difference between a flexible budget and a static budget is the static budget is not adjusted for changes in the level of activity. 2. To help assess how well a manager has controlled costs,<\/p>\n\n\n\n<p><mark style=\"background-color:rgba(0, 0, 0, 0)\" class=\"has-inline-color has-vivid-cyan-blue-color\"><strong>The correct answer and explanation is:<\/strong><\/mark><\/p>\n\n\n\n<p><strong>Correct Answer:<\/strong><br><strong>Statement 1 is true<\/strong>: <em>The main difference between a flexible budget and a static budget is the static budget is not adjusted for changes in the level of activity.<\/em><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Explanation (Approx. 300 words):<\/strong><\/h3>\n\n\n\n<p>Budgeting is a key component in financial planning and performance evaluation. Two common types of budgets used in organizations are <strong>static budgets<\/strong> and <strong>flexible budgets<\/strong>. Understanding the difference between them is essential for accurate performance measurement and managerial accountability.<\/p>\n\n\n\n<p>A <strong>static budget<\/strong> is created based on a fixed level of activity, usually prepared at the beginning of a period. It does <strong>not change<\/strong>, regardless of actual activity levels. For example, if a static budget is prepared for 10,000 units of production, it remains based on those 10,000 units\u2014even if the actual production is only 8,000 or goes up to 12,000. This type of budget is useful for planning purposes but has limitations when evaluating performance, as it doesn&#8217;t reflect real-world variations in activity.<\/p>\n\n\n\n<p>In contrast, a <strong>flexible budget<\/strong> adjusts for changes in the level of activity. It recalculates budgeted revenues and expenses based on actual activity levels. This allows for more meaningful comparisons and variance analysis. For instance, if actual production was 12,000 units instead of the budgeted 10,000, a flexible budget would adjust all variable costs to reflect this new volume, enabling a fairer evaluation of how well a manager controlled costs.<\/p>\n\n\n\n<p>Therefore, <strong>statement 1 is true<\/strong>, as the <strong>main difference<\/strong> between a flexible and a static budget is the <strong>adjustability<\/strong> of the budget to reflect actual activity levels.<\/p>\n\n\n\n<p>Statement 2 seems to be incomplete, but it likely refers to using <strong>flexible budgets to evaluate managerial performance<\/strong>. This would also be true in a complete form, as flexible budgets help isolate <strong>variances due to efficiency<\/strong> or <strong>cost control<\/strong> rather than activity level differences.<\/p>\n\n\n\n<p>In summary, static budgets are fixed and best for planning, while flexible budgets are dynamic and more effective for performance evaluation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Which of the following statements is true? 1. The main difference between a flexible budget and a static budget is the static budget is not adjusted for changes in the level of activity. 2. To help assess how well a manager has controlled costs, The correct answer and explanation is: Correct Answer:Statement 1 is true: [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-20992","post","type-post","status-publish","format-standard","hentry","category-quiz-questions"],"_links":{"self":[{"href":"https:\/\/gaviki.com\/blog\/wp-json\/wp\/v2\/posts\/20992","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gaviki.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gaviki.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gaviki.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gaviki.com\/blog\/wp-json\/wp\/v2\/comments?post=20992"}],"version-history":[{"count":1,"href":"https:\/\/gaviki.com\/blog\/wp-json\/wp\/v2\/posts\/20992\/revisions"}],"predecessor-version":[{"id":20993,"href":"https:\/\/gaviki.com\/blog\/wp-json\/wp\/v2\/posts\/20992\/revisions\/20993"}],"wp:attachment":[{"href":"https:\/\/gaviki.com\/blog\/wp-json\/wp\/v2\/media?parent=20992"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gaviki.com\/blog\/wp-json\/wp\/v2\/categories?post=20992"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gaviki.com\/blog\/wp-json\/wp\/v2\/tags?post=20992"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}